• 开题报告
  • 社会实践报告
  • 申请报告
  • 研究报告
  • 党政报告
  • 可行性报告
  • 情况报告
  • 事迹材料
  • 申报材料
  • 述廉报告
  • 调查报告
  • 实验报告
  • 整改措施
  • 整改报告
  • 整改方案
  • 考察报告
  • 结题报告
  • 竞聘报告
  • 请示报告
  • 社会调查报告
  • 自查报告
  • 报告写作指导
  • 学习报告
  • 在老干部座谈会讲话

    时间:2020-09-02 08:17:56 来源:天一资源网 本文已影响 天一资源网手机站

      在合阳老干部及社会各界人士2013年度

     迎春工作通报会上的讲话

     杨武民

     (2014年元月10日)

     尊敬的各位老领导、同志们:

     值此新春佳节即将来临之际,县委、县政府把各位老领导、老同志及社会各界人士请来,一是和大家共迎新春,给大家拜个早年;二是通报过去一年全县的工作和新一年全县工作的基本思路,聆听大家的宝贵意见,共商合阳发展大计。借此机会,我谨代表县委、县政府向你们,并通过大家向你们的家人及全县广大离退休老干部、老同志和社会各界人士,致以节日的问候和美好的祝愿!下面,就2013年县域经济社会发展情况和2014年主要工作作以简要汇报。

     刚刚过去的一年,是全面贯彻落实党的十八大精神的开局之年。在市委、市政府和县委的正确领导下,县人民政府团结,落实国家各类亿元。

     manufacturers of technical documents on the quality requirements applicable to this project. Construction quality inspection and evaluation standards issued by the national power company of the electric power construction standard for quality inspection and assessment of the 11 articles assessment inspection standards as well as other relevant regulations issued by the Ministry of electric power, the State power company executive. Does not verify in the specification within the evaluation criteria, implementation design, manufacturer or ... Or issue a new national standards and regulations, bidders shall comply with new norms and standards. If there are conflicts or is inconsistent, whichever is the higher standards. 3.3 3.3.1 project of responsibility, authority and communication organization and project managers, at all levels of responsibility and authority see section II of chapter III of the present tender site management organization and part of workforce planning. 3.3.2 according ISO 9001, GB/T 50430 and company quality distribution of the quality manual, combining the departments of projects, project quality function distribution allocation table on the following page of the project's quality functions shown below. 3.3.3 project with each Department interface, interface between the internal departments of the project by project managers at all levels and the quality regulations of the responsibilities and authorities of the Department. Customer requirements and hope: project management; Quality planning, management program: the project's quality control Department; Site design: Project Engineering Department; Contract: the contract budget

     manufacturers of technical documents on the quality requirements applicable to this project. Construction quality inspection and evaluation standards issued by the national power company of the electric power construction standard for quality inspection and assessment of the 11 articles assessment inspection standards as well as other relevant regulations issued by the Ministry of electric power, the State power company executive. Does not verify in the specification within the evaluation criteria, implementation design, manufacturer or ... Or issue a new national standards and regulations, bidders shall comply with new norms and standards. If there are conflicts or is inconsistent, whichever is the higher standards. 3.3 3.3.1 project of responsibility, authority and communication organization and project managers, at all levels of responsibility and authority see section II of chapter III of the present tender site management organization and part of workforce planning. 3.3.2 according ISO 9001, GB/T 50430 and company quality distribution of the quality manual, combining the departments of projects, project quality function distribution allocation table on the following page of the project's quality functions shown below. 3.3.3 project with each Department interface, interface between the internal departments of the project by project managers at all levels and the quality regulations of the responsibilities and authorities of the Department. Customer requirements and hope: project management; Quality planning, management program: the project's quality control Department; Site design: Project Engineering Department; Contract: the contract budget

     manufacturers of technical documents on the quality requirements applicable to this project. Construction quality inspection and evaluation standards issued by the national power company of the electric power construction standard for quality inspection and assessment of the 11 articles assessment inspection standards as well as other relevant regulations issued by the Ministry of electric power, the State power company executive. Does not verify in the specification within the evaluation criteria, implementation design, manufacturer or ... Or issue a new national standards and regulations, bidders shall comply with new norms and standards. If there are conflicts or is inconsistent, whichever is the higher standards. 3.3 3.3.1 project of responsibility, authority and communication organization and project managers, at all levels of responsibility and authority see section II of chapter III of the present tender site management organization and part of workforce planning. 3.3.2 according ISO 9001, GB/T 50430 and company quality distribution of the quality manual, combining the departments of projects, project quality function distribution allocation table on the following page of the project's quality functions shown below. 3.3.3 project with each Department interface, interface between the internal departments of the project by project managers at all levels and the quality regulations of the responsibilities and authorities of the Department. Customer requirements and hope: project management; Quality planning, management program: the project's quality control Department; Site design: Project Engineering Department; Contract: the contract budget

     - 1 -

    相关关键词: 老干部迎春座谈会讲话

    • 范文大全
    • 教案下载
    • 优秀作文
    • 励志
    • 课件
    • 散文
    • 名人名言